Stanisław Domagałło

Encouraged by the success of Albatross conversion, the shipowner decided to entrust us with the preparation of the documentation for a large heavy-lift. Its main task was to transport large, weighing over 30 T each, modules from Korean shipyards to Norwegian fields. By working on such an ambitious project, we have gained several skills as an office, including those related to simulation of loading, reloading and slipping cargo onto the vessel, and the ship’s behavior in submerged and swimming states.

Mr. Stanisław Domagałło, Chief Designer

Our main focus while working on any cargo vessel project is understanding and supporting the ship owner’s business model. Following a personalized approach and using our advanced technical capabilities throughout the process let us deliver a customized, reliable, cost-effective unit regardless of its purpose, size, and area of deployment.

In our concepts, cost efficiency focus goes hand in hand with environmental compliance with known and future rules and regulations. We aim for the lowest possible emissions, fuel flexibility, and innovative power-generating solutions, such as vertical wind power generators.

OUR OWN DESIGNS

SEE VIDEO PRESENTATIONS AND LEAFLETS

HTV-57

90000 T HEAVY LIFT VESSEL - CONCEPT DESIGN


CUSTOMER: OHT
LOA: 256.50 m
CARGO DECK LOAD: 30 T/m2
DEADWEIGHT: 90000 T
MAIN PURPOSE: transportation of heavy cargo in oil and gas in the high seas, transportation of the components for offshore-wind operations

HTV-57 vessel 6
HTV-57 vessel 5
HTV-57 vessel 4
HTV-57 vessel 3
HTV-57 vessel 2
HTV-57 vessel 1
BREADTH: 57.00 m
DEPTH TO MAIN DECK: 14.80 m
DRAUGHT: 11.80 m / submerged - 32.80 m
BOLLARD PULL: 100 T
PROPULSION: main engine – 2 x 12380 kW / 127 rpm,
speed max. – 14,5 kn
ACOMMODATION: crew – 30 persons,
temporary crew – 44 persons
CARGO CAPACITY: Deadweight – 90000 T
Cargo deck load – 30 T/m2
Length of cargo deck – 210 m

Albatross OHT

CONVERSION TO SEMI-SUBMERSIBLE HEAVY LIFT VESSEL


CUSTOMER: OHT
LOA: 204.00 m
CARGO DECK LOAD: 30 T/m2
DEADWEIGHT: 34797 T
MAIN PURPOSE: transportation of heavy cargo in oil and gas in the high seas, transportation of the components for offshore-wind operations

Albatross vessel 05
Albatross vessel 12
Albatross vessel 13
Albatross vessel 11
Albatross vessel 10
Albatross vessel 09
Albatross vessel 08
Albatross vessel 07
Albatross vessel 06
Albatross vessel 4
Albatross vessel 3
Albatross vessel 2
Albatross vessel 1
BREADTH: 42.50 m
DEPTH TO MAIN DECK: 11.85 m
DRAUGHT: 10.80 m / submerged - 32.80 m
PROPULSION: main engine – 2 x 13280 kW / 127 rpm,
speed max. – 14 kn
ACOMMODATION: crew – 39 persons
CARGO CAPACITY: Deadweight – 34797 T
Cargo deck load – 30 T/m2
Length of cargo deck – 129.50 m

HL450 Chipolbrok

MERCHANT VESSEL - CONCEPT DESIGN


CUSTOMER: Chipolbrok
LOA: 172.00 m
DEADWEIGHT: 23600 T
MAIN PURPOSE: multipurpose cargo vessel, strengthened for the carriage of heavy cargoes and adapted for the carriage of containers

HL450 Chipolbrok vessel 3
HL450 Chipolbrok vessel 1
HL450 Chipolbrok vessel 2
HL450 Chipolbrok vessel 6
HL450 Chipolbrok vessel 5
HL450 Chipolbrok vessel 4
BREADTH: 27.00 m
DEPTH TO MAIN DECK: 13.90 m
DRAUGHT: 9.50 m
PROPULSION: speed max. – 16 kn
CARGO CAPACITY: Deadweight – 24000 T
Holds capacity - 23600 T
Container capacity - 1400 TEU
CRANES: 450 T SWL at outreach of 14 m
150 T SWL at outreach of 34 m
combinable 2 x 450 T SWL at outreach of 14 m

HL11400

MERCHANT VESSEL - CONCEPT DESIGN


CUSTOMER: Polevant
LOA: 128.90 m
CARGO DECK LOAD: 13630 T
DEADWEIGHT: 11400 T
MAIN PURPOSE: multipurpose dry cargo ship, equipped for the carriage of containers

HL11400 vessel 1
HL11400 vessel 2
BREADTH: 28.80 m
DEPTH TO MAIN DECK: 11.20 m
DRAUGHT: 7.80 m
PROPULSION: speed max. – 15 kn
ACOMMODATION: crew - 17 persons
CARGO CAPACITY: Deadweight – 11400 T
Holds capacity - 13630 T
Container capacity - 717 TEU
CRANES: 350 T SWL at outreach of 14 m
40 T SWL at outreach of 33 m
combinable 2 x 350 T SWL at outreach of 14 m

OTHER PROJECTS

PROJECT NAME UNIT TYPE CUSTOMER SCOPE OF THE PROJECT
Hawk   Songa Shipmanagement engineering services
Falcon   Songa Shipmanagement engineering services
Osprey   Songa Shipmanagement engineering services
Eagle   Songa Shipmanagement engineering services
46 Mattea   OHT engineering services

RELATED CASE STUDIES

Costa Concordia accident

NED-Project in the world of salvage

kreska

The accident of the cruise ship Costa Concordia off the coast of Isola del Giglio in January 2013 shook the entire world. It was an unfortunate combination of events and human factor that led to the disaster which cost the lives of over 30 people. It triggered the introduction of changes in the regulations of the International Maritime…

In order to ensure the maximum convenience of users when using the website, this website uses cookies.
Click "I agree" so that this information is no longer displayed.